Hawk-industries Hawkjaw Sr. Manual 100K-2GSR Serial Numbers 121 to Manuel d'utilisateur Page 67

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 192
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 66
Tools Required
3/4" wrench, 3/16" Allen wrench
Initial Steps
1. Make sure the HawkJaw is off
the drill pipe connection and in
the rest position on the derrick.
2. Shut down the Hydraulic
power unit.
3. Press the Grip button
repeatedly to bleed hydraulic
pressure.
4. Disconnect the Air power
supply.
5. Push in the “E” stop (E).
6. Assume that there is still a load
on every actuator. Proceed with
caution.
Spinner Motor Sequence
Valve
1. Use the 3/4" wrench to remove
the Sequence Valve Cover Bolts
(B) and Cover (C).
2. The Sequence Valve is located
within the Sequence Valve
Rubber Sleeve (S).
Changing All Other
HawkJaw Parts
66 Maintenance & Repair
E
Main Hydraulic Block Fitting and Hose Access
S
B
C
Vue de la page 66
1 2 ... 62 63 64 65 66 67 68 69 70 71 72 ... 191 192

Commentaires sur ces manuels

Pas de commentaire